Skip to main content Prerequisites
Logged In & Role
You’re logged into the CGIC App .
Your role is Production Manager , Manufacturing User , or System Manager .
Stock & Production Data
Component items have current on-hand and purchase rate information under Stock > Item > Item List.
Work Orders exist (if you want usage data) under Manufacturing > Work Order.
Items & BOMs
At least one submitted (Active) BOM exists under Manufacturing > Bill of Materials > BOM List.
All raw material and operation cost data are up to date in the BOM.
Permissions
Ensure you have access to the Reports module and the Manufacturing > Reports menu.
From the main menu, navigate to Manufacturing > Reports.
A list of BOM-related reports appears. Common report names include:
BOM Costing Report
BOM Material Requirement Report
BOM Version History Report
BOM Usage Report
2.0 Run the BOM Costing Report
Click BOM Costing Report .
In the filter panel, set:
BOM : select the BOM you want to analyze (e.g., “BOM-Danaval-Chocolate-001”).
Company : choose your legal entity (e.g., Charisma Global).
Quantity : enter the production batch size (e.g., 500 units).
Currency (optional): if multi-currency, select the currency for cost calculations.
Click Refresh (or Run ).
The report displays:
Raw Material Cost : sum of (Required Qty × Latest Buying Rate) for each component.
Operation Cost : sum of (Operation Time × Operation Rate) for each step.
Overhead/Additional Costs : any fixed or percentage-based charges defined in the BOM.
Total Batch Cost and Cost per Unit .
Review each line item’s cost contribution.
To export, click Download > CSV or Print to share with finance or management.
3.0 Run the BOM Material Requirement Report
Click BOM Material Requirement Report .
Set filters:
BOM : select your target BOM.
Quantity to Produce : enter the planned production quantity (e.g., 1,000 units).
From Warehouse (optional): to check material availability in a specific location.
Include Future Items (toggle): if you want to consider materials on pending Purchase Orders.
Click Refresh .
The report lists all raw materials with columns:
Item Code & Description
Required Qty (scaled for your batch)
Available Qty (on-hand in the specified warehouse)
Shortage Qty (if any)
UOM and Warehouse
Use this report to create Material Requests or Purchase Orders by clicking Create MR from the toolbar.
Export with Download > CSV or print to share with procurement.
4.0 Run the BOM Version History Report
Click BOM Version History Report .
Filter by:
BOM : choose the base BOM number (e.g., “BOM-Danaval-Chocolate-001”).
From Date / To Date : specify a date range to see revisions submitted within that period.
Click Refresh .
The report displays:
Revision No. (e.g., “BOM-0001-01,” “BOM-0001-02”).
Modified By and Modified On .
Change Log Summary (fields changed, old vs. new values).
Applicable From date for each revision.
Click any Revision No. to open that historical BOM in read-only mode.
Export or print to archive revision data for audits.
5.0 Run the BOM Usage Report
Click BOM Usage Report .
Set filters:
BOM : select the BOM you want to investigate.
Status (optional): filter Work Orders by status (e.g., “Completed,” “In Progress”).
Date Range : define a period to see which Work Orders used this BOM.
Click Refresh .
The report shows:
Work Order No. and Customer (if linked to a Sales Order)
Production Quantity and Completed Quantity
Workstation or Cost Center (where manufactured)
Status of each Work Order
Use this to identify how many units have been produced from a given BOM, and which orders remain open.
Export with Download > CSV or Print for production dashboards and capacity planning.