Prerequisites
- At least one BOM exists under
Manufacturing > Bill of Materials > BOM List. - You have read-only permissions for Manufacturing if you only need to view (no editing privileges required).
1.0 Navigate to the BOM List
- From the left‐hand menu, click
Manufacturing > Bill of Materials > BOM List. - The BOM List shows all active and disabled BOMs with columns for BOM No., Item, Quantity, Status, and Applicable From.
2.0 Locate the BOM You Want to View
- Use the Search Bar at the top to type part of the BOM number or item name (e.g., “BOM-Bottled Water”).
- Or click
Filters > Add Filterto narrow by:- Item (finished product name)
- Status (Active, Disabled)
- Applicable From date range
- Press Enter or click Apply—the list refreshes to show matching BOMs.
3.0 Open the BOM Profile
- In the filtered list, click the BOM No. (e.g., BOM-Bottled Water-001).
- The BOM form opens in Read-Only mode, displaying multiple tabs across the top:
- Production Item
- Operations
- Scrap & Process Loss
- Costing
- More Info
- Connections
- Website (if configured)
4.0 Review Key Tabs
**4.0.1. Production Item Tab **- Item: Name of the finished good (e.g., Bottled Water).
- Quantity to Manufacture: Default batch size (e.g., 1000 bottles).
- UOM: Unit of measure (e.g., “Nos”).
- Warehouse: Source warehouse for raw materials.
- Materials Table: Shows each component:
- Item Code & Description (e.g., “PET Bottle, Cap”)
- Required Qty to produce the batch
- UOM (e.g., “Nos”, “Kg”)
- Consumption Type (Mandatory, By-Product, etc.)
- Warehouse (where to pull that material from)
- With Operations checkbox: ensures operation costs are tracked.
- Operations Table: Lists each production step with columns:
- No. (sequence)
- Operation Name (e.g., “Filling & Sealing”, “Labelling”)
- Workstation Type (machine or work center)
- Operation Time (minutes per unit)
- Fixed Time (tick if time does not scale with quantity)
- Operating Cost (NGN) (calculated labor/machine cost)
- Displays expected Scrap % (e.g., 2% wastage) or Process Loss for the item.
- Helps plan extra raw material procurement to account for expected waste.
- Provides a Cost Breakdown:
- Total Raw Material Cost (sum of all components at current rates)
- Total Operation Cost (sum of all operation times × workstation rates)
- Overhead/Fixed Cost (if applicable)
- Total Cost per Batch and Cost per Unit (automatically calculated)
- Shows custom fields such as BOM Version, Notes, or Effective Date.
- May include additional manufacturing attributes, e.g., Batch Size Tolerance, Quality Standards.
- Lists linked documents and transactions:
- Work Orders created from this BOM (with status: Planned, In Progress, Completed)
- Material Requests generated for raw materials
- Previous BOM Versions (for easy navigation between revisions)
- If you’ve configured e-commerce or product pages, this tab displays how the BOM links to your website catalog (less common in pure manufacturing setups).
5.0 View Version History
- In any tab on the BOM form, click the Menu icon (⋮) or “View History” link (often located in the top‐right or at the bottom).
- A pop-up displays:
- Revision Number (e.g., 001, 002)
- Modified By (user who made the change)
- Modified On (timestamp)
- Change Log (fields that changed, old vs. new values)
- Click on a past version entry to open that historical BOM for review (in read-only mode).