Prerequisites
- Raw materials and finished goods are defined as Items
- Bills of Materials (BOMs) exist for your production items
1.0 Use Production Order Reports
- Open Production Order List
- Navigate to Manufacturing ▶️ Production Order ▶️ Production Order List.
- Filter by Status
- Use Filters ▶️ Status = “Completed” to see finished runs.
- Open a Production Order
- Click an order to view details. Under the Materials section, see exactly which raw materials and quantities were issued.
2.0 Review Material Consumption Report
- Access Material Consumption
- Go to Manufacturing ▶️ Reports ▶️ Material Consumption.
- Set Your Parameters
- From Date / To Date: define the period.
- Item Group: select Raw Materials.
- (Optional) Production Item: filter for specific finished goods.
- Run Report
- Click Refresh.
- The report shows each raw material, quantity planned (per BOM) vs. quantity consumed (actual issues).
3.0 Compare Planned vs. Actual
- Planned Qty: the amount of raw material the BOM called for
- Actual Qty: the amount consumed via Material Issue entries
- Variance: planned minus actual—for spotting over-use or wastage
4.0 Drill Into Stock Ledger
- Open Stock Ledger
- Stock ▶️ Stock Ledger
- Filter for Specific Production Runs
- Voucher Type = “Stock Entry” and Purpose = “Material Issue”
- Against Voucher: select your Production Order ID
- Analyze Movements
- Each line shows raw material out-flow with timestamps and batch/serial numbers (if used).
5.0 Adjustments & Returns
- If you return unused material from a production run:
- Create a Stock Entry ▶️ Material Receipt
- Link to the original Production Order under Against Voucher
- Enter returned quantities to update stock